Working with Integrations in Q-Play

Working with Integrations in Q-Play

This guide covers how to find the Integrations section, how to set up a new integration, and how to work with an integration once it is set up, including its jobs and run logs. It is a general guide. The specific configuration of each individual integration (e.g. Grafana, SharePoint Docs, Browser Automation) is covered in that integration's own guide.


1. Find the Integrations screen

You can get to the Integrations section from the Dashboard in two ways:

  • Click Integrations in the left-hand sidebar menu.
  • Click the Integrations summary card on the Dashboard, which shows how many integrations are active.

Both take you to the same place.



2. The Integrations overview

This screen lists all the integrations you have set up.

If nothing is set up yet, you will see an empty state asking you to click Add Integration to get started.


Each integration you have set up appears as a card showing:

  • The integration's icon.
  • A status badge.
  • The integration name.
  • The provider name and version number.
  • A Configure button, which opens that integration's own page.

At the top of the screen you also have:

  • A search bar to find a specific integration by name.
  • A Filters button.
  • A view toggle to switch between grid and list view.
  • The green + Add Integration button, used to connect something new.



3. Set up a new integration

Step 1: Browse available integrations

Click + Add Integration on the Integrations overview. This opens the Browse Integrations window, which shows all integrations you can connect.

Each entry shows an icon, name, version and a short description. The list is searchable and split into pages if there are many options.


Step 2: Select an integration

Click the integration you want to set up. This opens a setup flow specific to that integration.

Step 3: Follow the setup flow

Every integration has its own setup flow, and the number of steps varies. Some only need one step, others have four or more.

Whatever the number of steps:

  • The first step is always naming your integration. A name is filled in for you, but you can change it. This is useful if you set up the same integration more than once.
  • You move forward with the Next button on each step.
  • On the final step, the button changes to Create Integration.


The fields and steps in between (e.g. credentials or settings) differ per integration. See that integration's own guide for details.

Step 4: Confirmation

When you click Create Integration, you see the message Integration created successfully and are taken straight to the new integration's page.



4. The integration page

You land on the integration's page after setup. You also get here by clicking Configure on an integration's card in the overview.

At the top of the page you have:

  • A back arrow to return to the Integrations overview.
  • The integration's icon and name.
  • Status badges showing how the integration's jobs are doing, e.g. 1 working and 1 failing. If one or more jobs have failed, an Error badge is also shown.
  • An Enabled toggle. Switch it off to disable the whole integration, e.g. if you don't need it right now but may want to use it again later.
  • The integration's unique ID, with a copy icon.
  • A short description with a Read more link, which opens that integration's own guide.
  • The Settings button and the version number. See sections 9 and 10.

Below that is a row of tabs:

  • Overview, with statistics for the whole integration.
  • One tab for each job in the integration, named after the job. A green dot means the job is working, and a red dot means it is failing.
    • Add Job, to create a new job.
  • Event log, on the right-hand side.



5. The Overview tab

The Overview tab shows how the integration is performing across all its jobs:

  • Total Runs, Success Rate, Avg. Runtime and Last Success.
  • A Success / Failure chart showing how many runs passed and failed.
  • A Runs by Job chart showing how many runs each job has had.
  • A Jobs list showing each job with its status dot, success rate, number of runs and when it last ran. Use the play icon to run a job right away, and the gear icon to edit it. Click Add Job above the list to create a new job.



6. Jobs

Each integration works with jobs. What a job does and how to configure one is specific to each integration and is covered in that integration's own guide. To create a job, click + Add Job.

Click a job's tab to open it. If the job is failing, a Failed badge is shown next to the integration's name at the top of the page. A Run now button in the top right corner lets you run the job right away, outside its schedule.

Below the tabs you see the job name, an Edit Job button, a delete icon and the job's schedule, e.g. Scheduled ยท Every 30m.

Below that you have:

  • Total Runs, Success Rate, Avg. Runtime and Last Success for this job.
  • A Recent Runs chart. Each bar is one run, labelled with its run number. The height shows how long the run took, and the colour shows whether it succeeded (green) or failed (red).
  • Resource Output, which shows a preview of what the job produced. Click the expand icon to see it larger. If the run failed, the error is shown in a red banner across the preview.
  • A Recent Runs table listing each run with its Status, Job ID, Run #, Duration, Started, Triggered by, Resource and Error. Use All and Errors Only above the table to show every run or only the failed ones.



7. Read a run's log

When a run fails, or you just want to see what happened, open its log:

  1. Open the job's tab.
  2. In the Recent Runs table at the bottom, click the run you want to look at.

A panel opens from the right with the details of that run.


At the top of the panel you see the run number and full run ID, the job name, and a Run now button.

Below that, a row of details shows:

  • The status, e.g. Failed.
  • The exit code. What the code means differs from integration to integration, and depends on where the run failed.
  • How long the run took.
  • The date and time the run started.
  • What triggered the run, e.g. Scheduled.
  • The run number and ID.

If the run failed, the error message is shown in a red box.

The log itself is shown in the dark box below, with the number of lines at the top. Each line has a timestamp and describes what the integration did, step by step, so you can see how far the run got and where it stopped.

The buttons in the top right corner of the log let you:

  • Copy logs, to copy the whole log.
  • No wrap, to turn line wrapping off so each line stays on one line.
  • Expand view, to show the whole log in the panel without scrolling. Click it again to collapse the log.
  • Fullscreen, to open the log and screenshot in a large Job Logs window. Close it with the X in the top right corner, or with Exit fullscreen in the log's top right corner.


For integrations that take screenshots, the panel also shows the screenshot from where the run stopped, below the log. If there is no screenshot, the run usually failed before the virtual browser could load the page.


See the logs for all runs

To look through the logs of several runs at once, click View logs above the Recent Runs table. A panel opens from the right with the log for every run of the job, newest first.

Each run shows its status, run number, how long it took and when it ran, followed by its log and screenshot. The log has the same buttons as described above. Click the arrow next to a run to collapse or expand it.

Use All and Errors Only at the top of the panel to show every run or only the failed ones. The Run now button in the top right corner runs the job right away.



8. The Event log

Click Event log on the right-hand side of the tabs to see who changed, ran or moved the integration, and what changed.

Each entry shows:

  • Date, when it happened.
  • User, who did it.
  • Action, e.g. Ran a job, Updated the integration or Deleted a job.
  • Changes, what changed, e.g. Added the job Screenshot.

You can sort the list by Date, User or Action.



9. Integration settings

Clicking Settings opens a panel from the right with the same kind of information you filled in during setup.


The only field every integration has is the editable Name. Everything else in this panel depends on the integration. Some integrations also show fields like Timezone, Language or a Credentials section (e.g. authentication type and an authorization button), but not all of them do.

Save your changes with the Save Integration button at the bottom.



10. Manage versions

Every integration has a version number. Clicking it opens a list of Available Versions.

  • When you set up an integration, it is on the latest version.
  • Versions never change automatically. Settings and configuration can differ between versions, so an automatic upgrade could break an existing setup. You decide when, and whether, to upgrade.
  • If a newer version is available, the version button shows an Upgrade badge. Expand it to upgrade to any newer version.
  • Older versions are also listed, each with a Downgrade button, in case you need to roll back.